CLEAN IN PLACE, SYRUP & CAN FILLING LINE UPGRADE, Brisbane
Bundaberg Brisbane

Client: Bundaberg Brewed Drinks
Year: 2018-2020
Industry: Beverages
Location: Queensland

TFG Group have completed three separate packages to increase the efficiency of the Bundaberg Brewed Drinks facility in Bundaberg, Brisbane. The fabrication and installation of a four loop CIP system, syrup capacity upgrade which included the installation of three syrup holding tanks to upgrade the existing facility and a can filling line. This upgrade will allow Bundaberg to continue to deliver premium beverages in a more efficient timeframe.

TFG designed and provided 3D drawings for this specialised upgrade; ensured there was minimal disruption to the existing plant production; fabricated the new systems offsite; modified and removed existing systems; installed the new CIP, syrup tanks and piping for the can filling line; traffic management included closing roads surrounding the plant and managing traffic flow; management of roof removal including monitoring cranes and transport and connected existing plant with tie-in points.

This project was completed using orbital welding and 316 Stainless Steel. The installation was achieved with minimal downtime and achieved impeccable safety throughout this project with no LTI’s or MTI’s.

SHARE NOW