Reverse Osmosis Pump Container Skid
TFG Supports Paraburdoo Power Station Water Treatment Plant
Client: Gradient
Year: 2023
Industry: Water
Location: Western Australia
- CLIENT REQUIREMENTS
- CONTAINER REQUIREMENTS
- SURFACE TREATMENT & COATING
- INSPECTION TEST PLAN
In 2023, Gradient Australia was engaged to design,manufacture & commission a 2 x 430 m3/day Water Treatment Plant at the Paraburdoo Power Station in Mt Newman, Western Australia. As part of this scope of works, Gradient awarded TFG Group a contract for the manufacture, testing and transport of a Reverse Osmosis Containerised Pump Skid.
The container was fit out with the following items;
- Pump Skid fabricated in TFG Group’s Perth Workshop
- Control panels
- 3kW Split air conditioner
- Roof lighting
The skid was modified using Bondor wall panels on the inside walls and 3mm galvanised floor plates in the container floor.
Stringent RTIO surface treatment requirements were followed in addition to the container coating system which was designed to meet the harsh environmental considerations of the North West.
Testing was carried out successfully including the provision of a comprehensive Inspection Test Plan (ITP) in compliance with RTIO requirements.
- Fabrication drawing sign off and witness hold points
- Pressure testing of all pipework
- NDE/Testing of welds including weld mapping
- Dimension validations
- Weight tests