buffer tank

Case Study – Buffer Tank – RCR Tomlinson

SHENTON PARK WASTE FACILITY, WESTERN AUSTRALIA

BUFFER TANK

CLIENT: RCR TOMLINSON

YEAR: 2008

SECTOR: RESOURCES

TANK FABRICATION Austline Fabrications was awarded the design, engineering, fabrication and testing of the Buffer Tank to be installed for the purpose of Waster water treatment at Shenton Park in Western Australia. STRINGENT TIMELINE Austline successfully completed the fabrication of the 25mm walled tank in a short timeframe of 4 weeks. The design, engineering fabrication and final NDT testing was completed within the required time and produced a fully compliant tank fit for purpose on site. CORROCOAT Austline applied Corrocoat to the Buffer Tank internally and externally to ensure anti corrosion of the tank in the Waste Water facility. The coating application is often the time restricting factor during the fabrication process, however, due to the rapid cure of the product used, the cost and time benefits when using Corrocoat materials can be hugely advantageous. NDT TESTING Finally, on completion of the Buffer Tank, Austline was responsible for the Non-Destructive Testing of the tank before installation on site. This testing was conducted by NACE inspectors to ensure the highest possible quality standards were maintained in strict accordance with Austline’s ISO 9001 Quality Management System.

Case Study – Gold Mine Elution Skids

GOLD MINE ELUTION SKIDS

VARIOUS

CLIENT: ENGINEERED PROCESS SYSTEMS

YEAR: 2008-2010

SECTOR: RESOURCES

  ELUTION SKIDS Consultancy Engineers EPS awarded Austline Fabrications contracts to supply and fabricate several skid mounted Elution Circuit Heating packages. These skids were manufactured to be installed at a number of National and International Gold Mines. SCOPE OF WORKS Austline fabricated several skids with a custom galvanized frame structure and cladded with fitted floor where required. Austline also installed process equipment to custom isometric drawing specifications; pre spooled and fitted fabricated pipe spooling and specific flue equipment for each skid. Austline project managed the process of supplying insulation of the heat circuit pipe spools, fitted electrical instrumentation, flanges, flow meters, heat exchangers and associated specialised installation of pumps, tanks, tubing and valves. EPS required the elution packages and vessels to be pre commissioned and pressure tested. Austline performed the testing on our premises before transportation to site for the end client.
foodline-projects-little-creatures-geelong

Case Study – Little Creatures Brewery, Geelong

LITTLE CREATURES BREWERY, GEELONG

BREWHOUSE

CLIENT: KRONES

YEAR: 2012 – 2013

SECTOR: BREWING

ICONIC BREWERY EXPANSION

The success of the Little Creatures Fremantle brand and subsequent buy out by brewing giant Lion led to a $60m investment in a new Little Creatures brewery located in Geelong, Victoria.

After the successful installation of the Fremantle brewhouse expansion, Foodline Projects was the obvious choice to install the new brewhouse, fermentation vessels and filtration tanks at the new site in regional Victoria.
The East Coast shift reduces transport costs across the Nullabor and allows for even greater expansion of the Little Creatures iconic brand.

MECHANICAL INSTALLATION

Foodline’s specialised team of fabricators, welders and fitters installed;

  • All process pipework
  • Filtration vessels
  • Fermentation tanks
  • Heat exchangers
  • Over 4,000 fittings and valves